{"id":37726,"date":"2021-08-04T13:49:08","date_gmt":"2021-08-04T11:49:08","guid":{"rendered":"https:\/\/www.cfrcalatori.ro\/?p=37726"},"modified":"2021-08-04T13:49:08","modified_gmt":"2021-08-04T11:49:08","slug":"the-royal-station-of-bucharest-baneasa","status":"publish","type":"post","link":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/","title":{"rendered":"The Royal Station of Bucharest B\u0103neasa"},"content":{"rendered":"<p>Built during the same period as the Royal Station of Sinaia (1937-1938) and the underground passage from the Miori\u0163a Fountain, the Royal Station of Bucharest B\u0103neasa was intended for the departures and arrivals of King Carol the Second, members of the government, the Royal<br \/>\nFamily and high dignitaries invited in the capital. The esplanade connecting the station of B\u0103neasa to the main road allowed for troop alignment and development of processions. During the communist era, it became a presidential station, currently being used for boarding \/ disembarkation of passengers of some trains travelling on the 800 mainline.<\/p>\n<p><em>Since 2012, the Royal Station of B\u0103neasa, a station with historical significance, is periodically used by the Royal Family of Romania as a departure and arrival point for their symbolical journeys made by Her Royal Highness Princess Margaret with the Royal Train. From here, in 2017, King Michael the First left for his final journey towards Curtea de Arge\u015f, the necropolis of Romanian kings.<\/em><\/p>\n<p>The plans for the station were drawn in 1937 by architect Duiliu Marcu and their execution was performed by the team lead by engineer Mihai Gheorghiu. During the Second World War, following the American aerial bombing in 1944, the station was badly damaged, being rebuilt in the shape it currently has. The Royal Station fo B\u0103neasa is composed of a main building, which is the station itself, and a partially covered platform 70 metres in legth, reserved for the honor guard.<\/p>\n<p>The station\u2019s main building, with a surface of 280 square metres, includes halls destined exclusively for the king and a grand reception hall for the government and officials. The station itself is composed of a passageway, a private hall with toilets, a hall for aids and a wardrobe. The construction is made of reinforced concrete frames and the terrace type roof has inner drains for the rainwater. The facades are covered with Romanian travertine, the floor is made of big slabs of pink Ru\u015fchi\u0163a marble and black Belgium marble in the passageways, being covered with carpets in the halls.<\/p>\n<p>The building has heating and air conditionning, electric lighting (the cables being hidden by cornices meant for indirect lighting) and a hot water distribuiton system. The central heating plant is located in the basement. Doors and windows are methallic and covered with stainless steel. The walls of the reception halls and the royal passageway are covered with rose wood, while the walls in the king\u2019s hall are covered with walnut wood.<\/p>\n<div class=\"alert alert-info\">\n<h3>Did you know??<\/h3>\n<p>Before 1940, the Royal Station of Bucharest B\u0103neasa was knows and the Mogo\u015foaia Station.<\/p>\n<p>The history of this station begins in 1886, when the building known as the Mogo\u015foaia Station was inaugurated, meant for the carriage of goods. Thus, a secondary rail connection was provided between the capital and the Constan\u0163a harbor, in order to bypass the difficult and long route starting from the Station of T\u00e2rgovi\u015fte (the current Bucharest North), which went through the city\u2019s northern outskirts in order to reach its eastern side.<\/p>\n<p><em>In 1914, the lifeless body of King Carol the First was brought from Sinaia to the Mogo\u015foaia station in order to be transported to the Royal Palace on a gun carriage. On the 1st of December 1918, the Royal Family of Romania disembarked in this station from the train bringing them to Bucharest from their refuge in Moldova during the First World War, in order to continue their triumphant entry on horses. Here, King Ferdinand also disembarked on the 16th of October 1922, after returning from the crowning ceremony in Alba Iulia.<\/em><\/p>\n<\/div>\n<p style=\"text-align: justify;\"><strong><span lang=\"EN-US\" style=\"font-size: 10.5pt; font-family: 'Arial',sans-serif;\">#2021EuropeanYearofRailways<\/span><\/strong><span lang=\"EN-US\" style=\"font-size: 10.5pt; font-family: 'Arial',sans-serif;\"><br \/>\n<strong><span style=\"font-family: 'Arial',sans-serif;\">#EUYearofRail<\/span><\/strong><\/span><\/p>\n<p><em>Bibliography:<\/em><br \/>\n<em>Documentation regarding the ENCYCLOPEDIA OF THE STATIONS from ROMANIA \u201d, C.D.C.A.S. 2003, responsible: Architect Maria M\u0103nescu<\/em><\/p>\n<h3>Other articles on the same subject:<\/h3>\n<p><i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/railway-transport-the-most-ecologic-type-of-passenger-transport-in-europe\/\"><span style=\"font-size: 16px;\">Railway transport \u2013 the Most Ecologic Type of Passenger Transport in Europe<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/railway-transport-the-most-ecologic-type-of-passenger-transport-in-europe\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-future-of-transport-is-the-railway-chose-the-railway\/\"><span style=\"font-size: 16px;\">The future of transport is the railway \u2013 Chose the railway!<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-future-of-transport-is-the-railway-chose-the-railway\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/romania-founding-member-of-the-international-union-of-railways\/\"><span style=\"font-size: 16px;\"> Romania \u2013 Founding Member of the International Union of Railways!<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/romania-founding-member-of-the-international-union-of-railways\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/railway-transport-the-most-ecologic-type-of-passenger-transport-in-europe\/\"><span style=\"font-size: 16px;\"> Railway transport \u2013 the Most Ecologic Type of Passenger Transport in Europe<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/railway-transport-the-most-ecologic-type-of-passenger-transport-in-europe\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/steam-locomotives-museum-in-resita\"><span style=\"font-size: 16px;\">Steam locomotives museum in Re\u0219i\u021ba<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/steam-locomotives-museum-in-resita\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-ceferiada-event\/\"><span style=\"font-size: 16px;\">The \u201cCeferiada\u201d Event<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-ceferiada-event\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/steam-locomotives-museum-in-dej\/\"><span style=\"font-size: 16px;\">Steam locomotives museum in Dej<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/steam-locomotives-museum-in-dej\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/rail-transport-connects-europe\/\"><span style=\"font-size: 16px;\">Rail transport connects Europe<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/rail-transport-connects-europe\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/intelligent-transport\/\"><span style=\"font-size: 16px;\">Intelligent transport<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/intelligent-transport\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-train-the-railway-transport-is-cleaner\/\"><span style=\"font-size: 16px;\">The TRAIN = The railway transport is cleaner<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-train-the-railway-transport-is-cleaner\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/140-years-from-the-first-railway-built-entirely-by-romanian-engineers\/\"><span style=\"font-size: 16px;\">140 years from the first railway built entirely by Romanian engineers<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/140-years-from-the-first-railway-built-entirely-by-romanian-engineers\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-railway-connection-of-the-capital-with-the-east-and-the-west-in-the-beginning\/\"><span style=\"font-size: 16px;\">The railway connection of the Capital with the East and the West, in the beginning<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-railway-connection-of-the-capital-with-the-east-and-the-west-in-the-beginning\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-beginning-of-railways-in-europe\/\"><span style=\"font-size: 16px;\">The beginning of railways in Europe<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-beginning-of-railways-in-europe\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/explore-the-railway-route-suceava-putna\/\"><span style=\"font-size: 16px;\">Explore the railway route Suceava &#8211; Putna<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/explore-the-railway-route-suceava-putna\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-history-of-the-royal-train-cfr-calatori\/\"><span style=\"font-size: 16px;\">The history of the royal train &#8211; CFR C\u0103l\u0103tori<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-history-of-the-royal-train-cfr-calatori\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-danube-cliff-and-the-filesti-tunnel-in-the-european-year-of-railways\/\"><span style=\"font-size: 16px;\">The Danube Cliff and the File\u0219ti Tunnel in the European Year of Railways<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-danube-cliff-and-the-filesti-tunnel-in-the-european-year-of-railways\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-filiasi-bumbesti-livezeni-railway\/\"><span style=\"font-size: 16px;\">The Filia\u0219i \u2013 Bumbe\u0219ti \u2013 Livezeni railway<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-filiasi-bumbesti-livezeni-railway\/\">here<\/a><br \/>\n<i class=\"fa fa-info\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-caracau-viaduct-the-largest-concrete-arched-viaduct-in-romania\/\"><span style=\"font-size: 16px;\">The Carac\u0103u Viaduct \u2013 the largest concrete arched viaduct in Romania<\/span><\/a> click <a href=\"https:\/\/www.cfrcalatori.ro\/en\/the-caracau-viaduct-the-largest-concrete-arched-viaduct-in-romania\/\">here<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Built during the same period as the Royal Station of Sinaia (1937-1938) and the underground passage from the Miori\u0163a Fountain, the Royal Station of Bucharest B\u0103neasa was intended for the departures and arrivals of King Carol the Second, members of the government, the Royal Family and high dignitaries invited in the capital. The esplanade connecting the station of B\u0103neasa to the main road allowed for troop alignment and development of processions. During the communist era, it became a presidential station, currently being used for boarding \/ disembarkation of passengers of some trains travelling on the 800 mainline. Since 2012, the Royal Station of B\u0103neasa, a station with historical significance, is periodically used by the Royal Family of Romania as a departure and arrival point for&#8230;<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1240],"tags":[],"class_list":["post-37726","post","type-post","status-publish","format-standard","hentry","category-events"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Royal Station of Bucharest B\u0103neasa - CFR Calatori<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Royal Station of Bucharest B\u0103neasa - CFR Calatori\" \/>\n<meta property=\"og:description\" content=\"Built during the same period as the Royal Station of Sinaia (1937-1938) and the underground passage from the Miori\u0163a Fountain, the Royal Station of Bucharest B\u0103neasa was intended for the departures and arrivals of King Carol the Second, members of the government, the Royal Family and high dignitaries invited in the capital. The esplanade connecting the station of B\u0103neasa to the main road allowed for troop alignment and development of processions. During the communist era, it became a presidential station, currently being used for boarding \/ disembarkation of passengers of some trains travelling on the 800 mainline. Since 2012, the Royal Station of B\u0103neasa, a station with historical significance, is periodically used by the Royal Family of Romania as a departure and arrival point for...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/\" \/>\n<meta property=\"og:site_name\" content=\"CFR Calatori\" \/>\n<meta property=\"article:published_time\" content=\"2021-08-04T11:49:08+00:00\" \/>\n<meta name=\"author\" content=\"Eugen Nicodin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Eugen Nicodin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/\"},\"author\":{\"name\":\"Eugen Nicodin\",\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/e8a0ee20c6932a813c9fc94b06333c4a\"},\"headline\":\"The Royal Station of Bucharest B\u0103neasa\",\"datePublished\":\"2021-08-04T11:49:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/\"},\"wordCount\":817,\"articleSection\":[\"Events\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/\",\"url\":\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/\",\"name\":\"The Royal Station of Bucharest B\u0103neasa - CFR Calatori\",\"isPartOf\":{\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/#website\"},\"datePublished\":\"2021-08-04T11:49:08+00:00\",\"author\":{\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/e8a0ee20c6932a813c9fc94b06333c4a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.cfrcalatori.ro\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Royal Station of Bucharest B\u0103neasa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/#website\",\"url\":\"https:\/\/www.cfrcalatori.ro\/en\/\",\"name\":\"CFR Calatori\",\"description\":\"CFRCalatori.ro\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.cfrcalatori.ro\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/e8a0ee20c6932a813c9fc94b06333c4a\",\"name\":\"Eugen Nicodin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/949168e7d2f8e217f2cf3739446caf170691657bc08cdee09f8adbcc5c3a7a92?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/949168e7d2f8e217f2cf3739446caf170691657bc08cdee09f8adbcc5c3a7a92?s=96&d=mm&r=g\",\"caption\":\"Eugen Nicodin\"},\"sameAs\":[\"https:\/\/www.focusweb.ro\/\"],\"url\":\"https:\/\/www.cfrcalatori.ro\/en\/author\/eugen-nicodin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Royal Station of Bucharest B\u0103neasa - CFR Calatori","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/","og_locale":"en_US","og_type":"article","og_title":"The Royal Station of Bucharest B\u0103neasa - CFR Calatori","og_description":"Built during the same period as the Royal Station of Sinaia (1937-1938) and the underground passage from the Miori\u0163a Fountain, the Royal Station of Bucharest B\u0103neasa was intended for the departures and arrivals of King Carol the Second, members of the government, the Royal Family and high dignitaries invited in the capital. The esplanade connecting the station of B\u0103neasa to the main road allowed for troop alignment and development of processions. During the communist era, it became a presidential station, currently being used for boarding \/ disembarkation of passengers of some trains travelling on the 800 mainline. Since 2012, the Royal Station of B\u0103neasa, a station with historical significance, is periodically used by the Royal Family of Romania as a departure and arrival point for...","og_url":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/","og_site_name":"CFR Calatori","article_published_time":"2021-08-04T11:49:08+00:00","author":"Eugen Nicodin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Eugen Nicodin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/#article","isPartOf":{"@id":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/"},"author":{"name":"Eugen Nicodin","@id":"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/e8a0ee20c6932a813c9fc94b06333c4a"},"headline":"The Royal Station of Bucharest B\u0103neasa","datePublished":"2021-08-04T11:49:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/"},"wordCount":817,"articleSection":["Events"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/","url":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/","name":"The Royal Station of Bucharest B\u0103neasa - CFR Calatori","isPartOf":{"@id":"https:\/\/www.cfrcalatori.ro\/en\/#website"},"datePublished":"2021-08-04T11:49:08+00:00","author":{"@id":"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/e8a0ee20c6932a813c9fc94b06333c4a"},"breadcrumb":{"@id":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.cfrcalatori.ro\/en\/the-royal-station-of-bucharest-baneasa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cfrcalatori.ro\/en\/"},{"@type":"ListItem","position":2,"name":"The Royal Station of Bucharest B\u0103neasa"}]},{"@type":"WebSite","@id":"https:\/\/www.cfrcalatori.ro\/en\/#website","url":"https:\/\/www.cfrcalatori.ro\/en\/","name":"CFR Calatori","description":"CFRCalatori.ro","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cfrcalatori.ro\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/e8a0ee20c6932a813c9fc94b06333c4a","name":"Eugen Nicodin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cfrcalatori.ro\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/949168e7d2f8e217f2cf3739446caf170691657bc08cdee09f8adbcc5c3a7a92?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/949168e7d2f8e217f2cf3739446caf170691657bc08cdee09f8adbcc5c3a7a92?s=96&d=mm&r=g","caption":"Eugen Nicodin"},"sameAs":["https:\/\/www.focusweb.ro\/"],"url":"https:\/\/www.cfrcalatori.ro\/en\/author\/eugen-nicodin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/posts\/37726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/comments?post=37726"}],"version-history":[{"count":0,"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/posts\/37726\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/media?parent=37726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/categories?post=37726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cfrcalatori.ro\/en\/wp-json\/wp\/v2\/tags?post=37726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}